Legislation Details

File #: 25-049    Version: 1
Type: Presentation Status: Agenda Ready
File created: 1/9/2025 In control: Board of County Commissioners Study Session
On agenda: 1/28/2025 Final action:
Title: 2:15 PM *Infrastructure Design and Construction Standards 2024 Update
Attachments: 1. Board Summary Report, 2. Presentation, 3. Draft IDCS 2024 Update, 4. Draft IDCS 2025 Update (Redline)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsAudio/Video
No records to display.
To: Board of County Commissioners

Through: Bryan Weimer, Director, Public Works and Development

Prepared By:
prepared
Sue Liu, P.E. Engineer III, Engineering Services Division; Joseph Boateng, P.E. Engineer III, Engineering Services Division; Emily Gonzalez, P.E., Engineer II, Engineering Services Division end

presenter
Presenter: Ceila Rethamel, PE, Engineering Service Division Manager
end

Subject:
title
2:15 PM *Infrastructure Design and Construction Standards 2024 Update
end

Purpose and Request:
recommended action
Public Works and Development staff would like to present the 2024 Infrastructure Design and Construction Standards (IDCS) to the Board of County Commissioners (BOCC). The IDCS contains engineering design and technical criteria required for the design and construction of public improvements within unincorporated Arapahoe County. The modifications reflect current county processes, procedures, and recent technological advances while correcting language and references within the IDCS.

The purpose of this Study Session presentation is to present highlights of the changes made to the IDCS and provide a summary of comments received on the draft IDCS. Staff is requesting authorization to finalize the IDCS for BOCC adoption on February 25, 2025.
end

Background and Discussion: The last adopted version of the Infrastructure Design and Construction Standards (IDCS) took place in 2019 with minor modifications. This update proposes to complete a comprehensive review the IDCS. The primary focus was to update the standards to:
* Reflect current county processes, procedures, and recent technological advances
* Correct ambiguous, inconsistent, and conflicting language
* Remove or replace outdated or incorrect information and reference

As the County's primary design standard, this document is frequently used by developers, engineers, professional services providers, utility companies, County Staff, and other stakeholders to determine engineeri...

Click here for full text