To: Board of County Commissioners
Through: Katherine Smith, Acting Director, Public Works and Development
Prepared By:
prepared
Loretta Daniel, Long Range Planning Program Manager, Public Works and Development
end
presenter
Presenter: Loretta Daniel, Long Range Planning Program Manager, Public Works and Development
end
Subject:
title
Amendment to the 2018 Arapahoe County Comprehensive Plan to Incorporate Chapter V. Water Supply Element
end
Purpose and Request:
recommended action
Arapahoe County proposes to amend the 2018 Arapahoe County Comprehensive Plan to include a new chapter, Chapter V. Water Supply Element. The proposed Chapter V. Water Supply Element establishes a comprehensive framework to guide Arapahoe County’s long-range land use decisions while ensuring full compliance with statutory requirements under Senate Bill 24-174 (SB24-174).
end
Alignment with Strategic Plan: Sustainable Growth and Infrastructure - Support environmentally responsible development and energy efficiency in county operations.
Background and Discussion: Arapahoe County has long recognized the vital relationship between land-use planning and long-term water security. While the County completed a major water study in 2001 and recommended a 300-year groundwater protection policy during its 2018 Comprehensive Plan update, that policy was never codified into the Land Development Code or supported with a defensible technical analysis.
To resolve this regulatory gap and align with state law, the County initiated the Arapahoe County Water Supply Study, which the Board of County Commissioners formally accepted on November 12, 2024. Shortly before the Study’s completion, the Colorado General Assembly enacted Senate Bill 24-174 (SB24-174), requiring all local governments to incorporate a Water Supply Element into their comprehensive plans by December 31, 2026, with mandatory updates every five years.
To satisfy SB24-174 and achieve compliance under the Department of Local Affairs’ (DOLA) designated "High-Tech Pathway," staff consolidated all existing and updated water policies into a single, cohesive framework, Chapter V. Water Supply Element, of the Arapahoe County Comprehensive Plan.
Water Supply Study (2024)
Developed by a multidisciplinary consultant team (Forsgren Associates, LRE Water, and Michael Baker International) alongside advisory committees representing 12 local water providers and 11 municipal planning departments, the Water Supply Study serves as the foundation for the new Chapter V. The Study evaluated supply and demand through a 2050 planning horizon across three distinct geographic regions:
- Region 1 (Western Urban Area): Densely populated and served by major providers (e.g., Denver Water, Aurora Water, Englewood, ACWWA, and ECCV) that rely predominantly on renewable surface water from mountain snowmelt and the South Platte River.
- Region 2 (Central Developing Corridor): The county’s primary future growth area, relying almost exclusively on local alluvial wells and non-renewable Denver Basin groundwater.
- Region 3 (Eastern Agricultural Expanse): Predominantly ranching and agricultural area, with individual private wells and no centralized water districts (outside of Deer Trail).
A key contribution of the Water Supply Study is its three-dimensional hydrogeologic modeling (Petra™) of the Denver Basin bedrock aquifer system, consisting of the Dawson, Denver, Arapahoe, and Laramie-Fox Hills aquifers. Under Colorado groundwater law, allocation from deep bedrock aquifers in the Denver Basin (the Dawson, Denver, Arapahoe, and Laramie-Fox Hills aquifers) is determined by the state’s 100-Year Rule (or 1% Rule). This rule administratively assumes that 1/100th of the static volume of water beneath a property can be safely withdrawn each year for 100 years. However, statutory calculations rely on idealized, uniform assumptions that do not reflect physical realities over time.
The modeling exposed a critical gap between legal "paper" water rights and physical reality. The state’s 100-Year Rule overestimates long-term well performance due to the lowering of water tables, declining artesian pressure and variability in water yield due to aquifer characteristics, and well-to-well interference. The modeling showed that pumpable groundwater is physically available at only about 60 percent of the state statutory calculations.
To protect future residents and businesses from premature well failures, the Study established hydrogeological calibrated Annual Production Factors, multipliers applied to state calculations during land development reviews to more accurately reflect physical yields (0.60 for the Denver Aquifer, 0.42 for Upper Arapahoe, 0.27 for Lower Arapahoe, and 0.71 for Laramie-Fox Hills). Production Factors express the percentage of statutory decree water that can actually be reliably pumped over time (e.g., a Production Factor of 0.71 indicates that only 71% of the decreed paper water supply is physically available).
The Water Supply Study confirmed that overall countywide water supplies are sufficient to meet projected 2050 demand under both Low Growth (115,996 AFY) and High Growth (124,769 AFY) scenarios. However, long-term resiliency depends on identifying ways to improve water efficiency. Implementing demand-management practices, particularly targeting outdoor landscape irrigation, which represents over one-third of potential savings, will reduce overall countywide demand by approximately 12 percent.
Policy Framework and Chapter V Structure
In addition to incorporating findings and recommendations from the Water Supply Study, Chapter V. Water Supply Element consolidates and updates several of the County’s water policies which were previously located in multiple sections. Existing policies have been updated or combined with key findings from the Water Supply Study, or deleted if obsolete or already implemented.
Chapter V organizes the County’s long-range water goals into the following seven sections.
Section 1: Introduction and Statutory Compliance. This opening section establishes compliance with SB24-174 statutory requirements across the four core components of the law. By leveraging advanced modeling and GIS integration from the Water Supply Study, the County achieved compliance under the Department of Local Affairs’ (DOLA) "High-Tech Pathway" standard. It also details the extensive public engagement approach undertaken with two advisory committees, along with feedback from over 500 survey participants and open houses that reflected community priorities.
Section 2: Current Water Landscape. Setting the physical context, this section outlines the hydrogeologic conditions across three geographic regions defined in the Water Supply Study. It establishes baseline evaluations for surface water and groundwater supplies, with particular focus on the four formations of the Denver Basin aquifer system: the Dawson, Denver, Arapahoe, and Laramie-Fox Hills aquifers.
Section 3: Growth Scenarios and Projected Water Demand (2050 Horizon): To address long-term concerns about water out to 2050, which aligns with the Colorado Water Plan, this section models two demographic growth tracks:
• Low Growth (Business as Usual): Assumes steady economic activity and historical trends, reaching 900,000 residents and 532,000 jobs.
• High Growth (Hot Growth): Assumes rapid economic expansion and strong in-migration, reaching 960,000 residents and 595,000 jobs.
These projections resulted in population growth and calculate demand per water provider under both baseline and conservation-adjusted conditions. The analysis evaluates these demands against available supplies, incorporates the state’s 100-year rule, and applies Petra™ modeling to establish "Production Factors", a key policy recommendation for land use, development, and regulatory decision-making.
Section 4: Water Supply Management and Groundwater Protection. This section establishes policies that mandate the transition of urban development to renewable water, restrict routine groundwater use to emergency scenarios, recommend codifying Production Factors into County regulations, require early-stage water verification checklists, and restrict the creation of isolated rural water districts.
Section 5: Water Conservation and Efficiency. Reflecting rising drought risks and alignment with the Colorado Water Plan, this section provides a comprehensive conservation roadmap. This section leverages countywide land-use authority alongside local utility operations to lower per-capita demand and build long-term climate resilience through policies for water-wise site design, updated landscape standards, expanded water reuse, and shared jurisdictional goals.
Section 6: Water Collaborative Policies and Actions. Recognizing that water supply management extends over local boundaries, this section establishes goals, policies, and strategies for cross-jurisdictional collaboration. To operationalize these goals, the strategies call for formal arrangements, such as regional forums, Memoranda of Understanding (MOUs), and technical data-sharing, to protect drinking water sources, streamline permitting for major infrastructure like reservoirs, and support regional renewable water initiatives such as the Water, Infrastructure and Supply Efficiency (WISE) project.
Section 7: Water Supply Element Implementation. The concluding section outlines the continuous implementation framework necessary to maintain long-range alignment. It focuses on three ongoing key approaches: integrating with the Colorado Water Plan, maintaining active partnerships with local water providers, and establishing five-year statutory reviews of Chapter V, with a full review by 2031 and a major water supply study update in 20 years.
The draft Chapter V. Water Supply Element was distributed to 95 referral agencies and entities. By the deadline for responses, staff received five “no comments” responses, and Arapahoe County Public Health suggested editorial corrections and other revisions. These suggestions have been incorporated into Chapter V.
The draft Chapter V was reviewed by the Department of Local Affairs (DOLA) as a courtesy review, and DOLA confirmed that Chapter V. Water Supply Element meets the statutory requirements of SB24-174, and also confirmed its eligibility for the “high-tech pathway” compliance track due to the advanced modeling used in the 2024 Water Supply Study.
Two responses, City of Englewood and Inverness Water and Sanitation District, were received after the deadline and took issue with information for their districts in the Water Supply Study. To address this, staff has proposed to meet with these two agencies to address their concerns, given that the Water Supply Study had extensive outreach with water providers and was accepted by the Board in November 2024.
The Arapahoe County Planning Commission held a public hearing on October 20, 2026, and unanimously moved to adopt Chapter V. Water Supply Element as an amendment to the Comprehensive Plan and submit the Plan to the Board of County Commissioners for approval. The vote was 7-0.
The Board of County Commissioners' public hearing regarding the amendment to the Comprehensive Plan was duly noticed in newspapers of general circulation including the I-70 Scout on November 4, 2026, and the Littleton Independent, Englewood Herald, and Centennial Citizen on November 5, 2026
Alternatives: The Board of County Commissioners has alternatives that include the following:
1. Approve the proposed Comprehensive Plan amendment as recommended by staff or with changes.
2. Deny the proposed Comprehensive Plan amendment.
3. Continue to a date certain for more information.
Fiscal Impact: There is no fiscal impact at this time. Projects identified as strategies in Chapter V. Water Supply Element may require future County funding, but each will be addressed by the Board on a project-by-project basis, as required.
Alignment with Strategic Implementation Strategies: The attached framework helps Arapahoe County institutionalize values-based, transparent decision-making, documenting how we make decisions and carry out actions to achieve the county’s strategic plan.
Staff Recommendation: Staff recommends approval of the Comprehensive Plan Amendment to incorporate Chapter V. Water Supply Element.
Concurrence: On October 20, 2026, the Planning Commission unanimously approved the Comprehensive Plan Amendment to incorporate Chapter V. Water Supply Element. No members of the public testified regarding the matter.