araphoe county logo
File #: 25-067    Version: 1
Type: Resolution Status: Passed
File created: 1/13/2025 In control: Board of County Commissioners Business Meeting
On agenda: 1/28/2025 Final action: 1/28/2025
Title: C22-12 Tempe Roundabout Project - Acceptance of the Real Property Donation from Southeast Metro Stormwater Authority
Attachments: 1. Board Summary Report, 2. Resolution
To: Board of County Commissioners

Through: Bryan D. Weimer, Director, Public Works and Development

Prepared By:
prepared
James Beall, PE, Engineer II, Public Works and Development
end

Subject:
title
C22-12 Tempe Roundabout Project - Acceptance of the Real Property Donation from Southeast Metro Stormwater Authority
end

Purpose and Request:
recommended action
The purpose of this report is to request the Board accept the Real Property Donation from Southeast Metro Stormwater Authority (SEMSWA) to facilitate the construction of the Tempe Roundabout Project.

Staff has reviewed the construction plans and easements and have determined that the donated Permanent Easements and Right of Way will meet the requirements of the Project. Staff recommends that the Permanent Easements, granted by Southeast Metro Stormwater Authority, be accepted by the Board.

Actions Requested:
1. Approval and acceptance of the Right of Way and Permanent Easement for the Tempe Roundabout Project by the Board of County Commissioners.
2. Authorize Bryan Weimer, Director, Department of Public Works and Development for signature and execution of the Right of Way and Permanent Easement Transaction on behalf of the Board of County Commissioners.
end

Background and Discussion: The Project is located in Section 12, Township 5 South, Range 67 West of the 6th Principal Meridian, and is located in the Copperleaf Development located in the central portion of Arapahoe County. The Project is to retrofit an abnormal passage of Tempe Street where roadway geometry has a near-90-degree turn. This layout was approved and constructed in the Fall of 2006 / Spring of 2007 to facilitate future filings within the Copperleaf Development. This layout was originally approved to enable alternate roadway construction of future filings to the north and east or a possible Belleview Avenue Bridge over E470. The construction of the Roundabout has been designed increase safety of motorists, pedestrians...