Title: UASI21-003 Bronco Pipeline Company Gathering System Phase I & II Use By Special Review/1041 Major Amendment
Attachments: 1. Board Summary Report, 2. Presentation, 3. Planning Commission - June 7, 2022, 4. Planning Commission Staff Report, 5. Engineering Services Report, 6. Vicinity Map, 7. Rangeview Metro District Opposition, 8. Draft Motions, 9. Resolution
To: Board of County Commissioners

Through: Bryan Weimer, Director, Public Works & Development
Jason Reynolds, Planning Division Manager, Public Works & Development

Prepared By:
prepared
Kat Hammer, Senior Planner, Public Works & Development
end

presenter
Presenter: Kat Hammer, Senior Planner, Public Works & Development
end

Subject:
title
UASI21-003 Bronco Pipeline Company Gathering System Phase I & II Use By Special Review/1041 Major Amendment
end

Purpose and Request:
recommended action
The applicant, Crestone Peak Resources Midstream, LLC is requesting an amendment to Broncos Pipeline Company Gathering System - Phase I and II Use by Special Review Plan (USR) narratives, case numbers U13-001 and U14-001.
end

Background and Discussion:
The proposed amendment would allow for the inclusion of freshwater pipelines within the pipeline easements, freshwater and/or produced water pipelines greater than 14 inches in diameter, and clarify the types and total number of utilities proposed within the easements. The previously approved USRs allow for installation of three co-located gathering pipelines (oil, natural gas and produced water) and a fiber optic cable installation. This proposal includes the introduction of freshwater pipeline and clarifies that the pipeline corridor may include different types of lines (one of each type, two oil lines, multiple water lines, etc.). Although the applicant does not have an anticipated construction start date, approval of this application would allow pipeline construction in the future.

The amendment also proposes an increase of the maximum allowable width of easements obtained from landowners, from 75 feet to 100 feet. Phase I and Phase II allow for a 75-foot permanent easements and 50-foot permanent easement, respectively, with a 25-foot temporary construction easement. If this amendment is approved the maximum easement width for both phases of the project ...