Title: Kiowa Creek North Master Plan Adoption
Attachments: 1. Board Summary Report, 2. Conceptual Master Plan, 3. Final Master Plan Report, 4. BOCC Meeting - June 28, 2022, 5. Resolution

To:                                                               Board of County Commissioners

 

Through:                                          Shannon Carter, Director, Open Spaces

 

Prepared By:

prepared

Ray Winn, Planner II, Open Spaces

end

 

Subject:

title

Kiowa Creek North Master Plan Adoption

end

 

Purpose and Request:

recommended action

The Board is requested to adopt the recently completed Kiowa Creek North Master Plan, conceptual improvement plan. The Board also reviewed this plan and approved its addition to the consent calendar at their meeting on June 28, 2022.

end

 

Background and Discussion: Kiowa Creek North is located on the northwest corner of Kiowa Bennett Road and Mitchell Road, in Bennett, Colorado, and is approximately 265 acres of unimproved open space. The property was purchased in 2009 to be maintained as an open space, for future passive use recreation. Project programing was determined through community outreach efforts and available budget. The site is unique because of its matrix of ecological communities and intact riparian corridor splitting the site. This riparian corridor provides abundant opportunities for enhancing and preserving essential wildlife habitat and a unique ecological setting amongst highly developed and fast growing rural agricultural communities.

OS staff worked with the consultant DHM to draft a Master Plan Concept for the Park. The concept was then presented to the public for input. The KCNOS Master Plan process utilized public outreach at Bennett Days as well as a project website with an online survey and comment portal. The feedback was overwhelming positive with over 100 in-person conversations at Bennett Days, 57 survey responses, and 13 website comments.   In general, the public outreach indicates that residents want to preserve the precious ecological habitat of the open space while providing much needed passive low-impact recreational amenities. This much public input is extremely rare in master plan processes and the overwhelming positive comments lets us know we are on the right track with design and substantiates the need and desire for the park.   

The final park improvement concept (attached) includes many passive recreation amenities while preserving and showcasing the beauty of the riparian habitat of Kiowa Creek. We anticipate this park to be a major regional recreation destination in the eastern portion of the County. The amenities include an extensive crusher fines trail network and natural surface horse and mountain bike trail,  picnic areas, pavilions/outdoor class room, wayfinding and interpretative signage,  two parking areas including horse trailer parking, horse challenge course, boardwalks over riparian habitat, boulder seating, picnic tables, shade structures at major viewpoints, archery range, restrooms (vault toilet) and drinking fountain, horse hitching posts, horse water area, hammock posts, bike racks and bike repair station, and trash cans. All of these amenities presented in the Master Plan Concept were overwhelmingly supported by the public outreach feedback. When asked what folks would change the overwhelming response was “nothing” or “I can’t think of anything else to add.”

This park will also serve as a regional trail connection for expansion of the multimodal network eventually connecting Antelope Hills and adjacent planned development to Bennett and into the Adams County multimodal network. The town of Bennett is currently submitting plans to extend the trail from Antelope Hills down Kiowa/Bennett Rd. and through an underpass directly to the KCNOS Park. In the future, the Town of Bennett plans to connect to the KCNOS park from the north creating a regional multimodal connection between the residential developments in the south to the Town of Bennett and the Adams County multimodal network to the north.   We anticipate this park to be a major recreational, ecological, and multimodal amenity for the fast-growing plains communities in the eastern portion of the County. Development in this portion of the County is growing at a rapid pace and providing this amenity now is critical to support the recreational and multimodal needs of current and future residents while also preserving precious riparian habitat that will likely be lost in future development. 

The next step is to take the Master Plan Concept through the design process and submit the Location and Extent plan to the planning department (approx. six months). We will be issuing an RFP for this process to secure a consultant for design that is familiar with the Location and Extent process. Once design is complete, we will issue an RFP for construction and secure a contractor to start construction of the park anticipated in 2023.

 

Alternatives: Without Adoption of the Master Plan the design process will not move forward and the park will not be constructed. Without this regional park, we risk providing a diminished level of service for recreation that will be created by the rapid development of the area. We also will be forcing the Town of Bennett to create another trail to nowhere as the underpass and trail will stop at our property and not be utilized. Without this funding the regional multimodal connection north to Bennett will also not be possible. 

 

Fiscal Impact: Design has not been completed but design costs are allocated in the Open Spaces budget. Once design is completed, staff will have a probable cost that will be brought back to the BoCC for funding approval.

 

Alignment with Strategic Plan:

                     Be fiscally sustainable

                     Provide essential and mandated service

                     Be community focused

 

Concurrence: The Open Spaces Trails Advisory Board (OSTAB) unanimously approved this request at the April 25th OSTAB meeting. .

 

Resolution:  Attached is a copy of the draft resolution.